BNL Sewage Treatment Plant Upgrade
PWGC worked closely with BNL to upgrade their sewage treatment plant in order to reduce concentrations of metals discharged into the Peconic River.

In order to comply with a New York State Department of Environmental Conservation (NYSDEC) directive to reduce concentrations of metals discharged into the Peconic River from Brookhaven National Laboratory’s (BNL) Sewage Treatment Plant (STP), the laboratory decided to upgrade the STP by adding a tertiary treatment component and re-directing the plant effluent away from the Peconic River to groundwater recharge beds.  Unique challenges to the project included the careful siting of the proposed groundwater beds so as not significantly alter the groundwater flow regime beneath the site.  Altering of the flow regime could influence the pathways of several groundwater contaminant plumes that are currently being remedied under CERCLA.  Further, the proposed groundwater recharge beds were required to be located close to the existing STP infrastructure, but not so close to the adjacent Peconic River that treated effluent would contribute base flow the river bed.  PWGC worked closely with BNL and their groundwater modeling support team to identify a location for the groundwater recharge beds that would not negatively impact the local groundwater flow regime and Peconic River base flow.

In addition to the design of the groundwater recharge beds, PWGC prepared detailed plans and specifications for the addition of a tertiary treatment system which included two drum filters and drum filter building.

Services: Wastewater & Water Resources, Waste Management
Industry: Industrial

PWGC’S ROLE:

  • Title I and Title II Engineering Design Services, including:
    • Performance of hydrogeologic analysis to characterize soil conditions in the
      proposed recharge area
    • Design and location of four new recharge basins
    • Evaluation of Tertiary Filtration System options
    • Design of Tertiary Filtration System
    • Design of flow monitoring station and system controls
    • Demolition Plan design and sequencing of existing discharge and monitoring equipment
    • Preparation of Construction Cost Estimates
    • Preparation of Construction Schedule using Primavera P6 software
    • Electrical design including Arc Flash and Lightning Protection analyses and standby power upgrades
  • Preparation of Title I Design Report
  • Preparation of Title II Design Package including Plans and Specifications
  • Bid Phase support services
Have a Project?
Sample Projects
Meschutt Beach Wastewater Upgrade
An upgraded sewage disposal system reduced the amount of nitrogen entering Peconic Bay by 65%.
Lake Ronkonkoma Wastewater Upgrade
PWGC designed an innovative on-site wastewater treatment system to upgrade the sewage system at Lake Ronkonkoma County Park
Dewatering of Franklin Hospital North Wing
We were hired to find a permanent solution to recurrent flooding in a subterranean wing of a Northwell Health hospital

Industry Updates

PWGC provides occasional industry-tailored newsletters to help you stay updated on ever-changing environmental rules, regulations, and pertinent news. Industry newsletters are published seasonally and as needed.