PWGC provided Allied conceptual design documents, full scale design document production, construction administration and construction oversight of the construction and installation of a new 6,000 gallon AVGAS skid fuel system.
PWGC provided Allied conceptual design documents, full scale design document production, construction administration and construction oversight of the construction and installation of a new 6,000 gallon AVGAS skid fuel system.
The system consisted of a skid mounted tank and pumping system. The project included the design and installation of a new concrete containment pad design for the system. The new system was integrated into the existing electrical, tank monitoring and fuel management system. All work was designed and installed in compliance to applicable industry, state, federal and Port Authority standards.