PWGC upgraded petroleum storage facilities and associated fueling systems at six bus depots owned by GTJ, Inc., in order to comply with federal, state, and NYC regulations for UST and AST systems. The systems lacked overfill and corrosion protection, and/or leak detection range in capacity from single 275-gallon tanks to multiple manifold systems with combined capacities of 10,000 gallons.
PWGC developed a cost effective approach to manage the project. Using Geoprobe® technology to perform soil sampling and characterization during the design phase of the project, allowed for a speedy determination of the extent of petroleum-contaminated soil (PCS). The delineation of PCS determined the amount of excavation required prior to construction, which prevented delays during construction due to sampling and lab analysis. PWGC implemented a comprehensive program for the facilities’ upgrade within a strict schedule.